Projects
Clemcorp Australia designed, supplied and delivered a turnkey installation of the primary surface ventilation system for the Kathleen Valley project, operated by Liontown Resources Ltd. The primary ventilation system comprised two CC3080/1680 axial fans, each rated at 1,150 kW, installed at two separate RAR locations.
The scope also included electrical switch rooms, HMI, and Maestro Vigilante airflow and pressure monitoring systems. Clemcorp partnered with Quattro and MIE throughout the project, which was concluded in September 2025.