Our Projects Clemcorp Australia 

The ventilation system on a remote mine site is often the most overlooked part of the critical operating infrastructure. Fan downtime can severely reduce the mines production and development, not to mention the expense of on-site servicing.

Similarly an incorrectly specified or poorly designed system can cost hundreds of thousands of dollars in additional power consumption annually. Here are some examples of projects Clemcorp Australia have spearheaded.

St Barbara Mines

St Barbara Mines Environmental Telemetry Package

Maestro telemetry package retrofitted by Clemcorp to primary fans in accordance with mining regulations.

read more
Saracen Gold Mines Primary Fans

Saracen Gold Mines Primary Fans

Primary ventilation system and support infrastructure provided by Clemcorp Australia.

read more
Evolution Mining Primary Fans

Evolution Mining Primary Fans

Axial fan systems mechanically and eletrically installed and fitted by Clemcorp Australia.

read more
Copperchem Heap Leach Aeration

CopperChem Heap Leach Aeration

Ventilation system using an axial fan solution and custom made ductwork commissioned by Clemcorp.

 

read more