Mechanically and Electrically Installed by Clemcorp

Two 2.26m diameter 315kW axial fans were provided to an Evolution Mining underground mine by Clemcorp, along with variable speed drives in air-conditioned switchrooms, to meet their primary ventilation requirements. One fan was vertically mounted and the other horizontally mounted with associated ductwork and inlet bend. Both systems were mechanically and electrically installed and commissioned by Clemcorp.